deconstruction.kph.co.uk
1-2 Welbeck Street | KpH Deconstruction
http://deconstruction.kph.co.uk/project/1-2-welbeck-street-strip-out-and-enabling
Health & Safety. Working safely for our future. Soft Strip and Enabling. Structural Alteration and Concrete Demolition. Strip Out and Enabling. Scottish Widows Unit Fund. Enabling Works Package including asbestos removal, and strip out to all 6 floors operating above a live retail unit. Acting as Principal Contractor, KPH completed the Strip Out of 6 storeys above a live retail unit at 1-2 Welbeck Street. West Croydon Bus Garage. Cannon Bridge House – Phase 1. 40-41 Great Marlborough Street.
deconstruction.kph.co.uk
Projects | KpH Deconstruction
http://deconstruction.kph.co.uk/projects
Health & Safety. Working safely for our future. Soft Strip and Enabling. Structural Alteration and Concrete Demolition. Cannon Bridge House – Phase 1. Soft Strip and Enabling Client: Blackstones Project: Cannon Bridge House, London Project Value: 135,000 Brief Description Working as the Principal Contractor alongside Alinea Consulting and Turner and Townsend, KpH Deconstruction completed two phases of a 7 week soft strip contract […]. 40-41 Great Marlborough Street. West Croydon Bus Garage. Demolition Cl...
deconstruction.kph.co.uk
Ash House, Staines | KpH Deconstruction
http://deconstruction.kph.co.uk/project/ash-house-staines-enabling-works
Health & Safety. Working safely for our future. Soft Strip and Enabling. Structural Alteration and Concrete Demolition. Ash House, Staines. Scottish Widows Investment Partnership. Ash House, Staines, Middlesex. Complete Strip Out back to core across 5 floors of a Commercial Office Block, situated in close proximity to adjacent occupied buildings. The scope of works consisted of the following:. Strip Out and removal of all mechanical installations, central plant, pipework, ductwork, condensers, etc.
keithbintley.co.uk
New fees payable for starting detailed assessment | Keith Bintley
http://www.keithbintley.co.uk/2015/07/14/new-fees-payable-for-starting-detailed-assessment
New fees payable for starting detailed assessment. Posted on Jul 14th 2015. These were introduced on 9 March 2015:. Where the amount of the costs to be assessed. Does not exceed 15,000. Exceeds 15,000 but does not exceed 50,000. Exceeds 50,000 but does not exceed 100,000. Exceeds 100,000 but does not exceed 150,000. Exceeds 150,000 but does not exceed 200,000. Exceeds 200,000 but does not exceed 300,000. Exceeds 300,000 but does not exceed 500,000.
keithbintley.co.uk
About | Keith Bintley
http://www.keithbintley.co.uk/about
Keith Bintley Ltd was formally established in 2010 but its heritage stretches far further back. The principal began his career in costs over 20 years ago when working for a large London firm of solicitors that became Eversheds, London. Keith met his colleagues while they were all directors of a national firm of costs lawyers and he was the training director. The firm is instructed by a number of high profile clients and has been involved in notable cases. On occasion, costs cases have been successful...
keithbintley.co.uk
Recovering the costs of photocopying | Keith Bintley
http://www.keithbintley.co.uk/2015/07/02/recovering-the-costs-of-photocopying
Recovering the costs of photocopying. Posted on Jul 2nd 2015.
photographybykevinsmith.co.uk
Professional Schools Photography in Caterham, Croydon, Sutton, Reigate, Redhill – Photography by Kevin Smith
http://photographybykevinsmith.co.uk/schools.html
Photography by Kevin Smith. I am available to shoot Schools and Nursery photographs. I am CRB checked and also a dad of two young girls! I can take formal photographs and less formal 'around the school' shots.
deconstruction.kph.co.uk
Rivers Office Park | KpH Deconstruction
http://deconstruction.kph.co.uk/project/rivers-office-park-enabling-works
Health & Safety. Working safely for our future. Soft Strip and Enabling. Structural Alteration and Concrete Demolition. Rivers Office Park, Rickmansworth – Phase 1. Working on behalf of Interior Motives, KpH Environmental undertook Phase 1 of these works to enable the follow on fit-out by our client Interior Motives. The project involved the complete strip out of the building including craneage of roof top plant. Undertaken in Building 3 of The Rivers Office Park, our works involved the:.